An all hands effort was devoted to transporting and installing the first section of the Lumber Camp Bridge. Of course, lots of other stuff got done.
VIDEO
Uploaded by Robert Silverstein on 2019-06-28.
An all hands effort was devoted to transporting and installing the first section of the Lumber Camp Bridge. Of course, lots of other stuff got done.
VIDEO