Studying the Switch Assembly
The masters (Ed and Bill) reviewing the operation of the switch assembly
View fullsize
Mike and Jerry getting ready to build the last window frames
View fullsize
Mike approves of the work of his team
View fullsize
The Roundhouse team also adds to our inventory of ties
View fullsize
It takes a village to drill and prepare the ties
View fullsize
Bruce begins the process of widening the right of way so that we can have three tracks at the entrance of Rabbit Flat.
View fullsize
Tom finishes off another of his fine looking buildings
View fullsize
Tom welding switch parts
View fullsize
Carl makes sure tools are in the right place and accessible for all of us.
View fullsize
Bruno preparing a long support for a switch stand
View fullsize
Bruno and Marty install the switch stand
