
The guards were on duty
This was a big day! The floor for the roundhouse was poured by the professionals. This was started before 7 and done by 9. I’m glad we did not have to mix and pour ~300 sacks of concrete. Check out the movies captured by Bruce below.
Lots of progress in the shop too.